| Ser. No |
List of design documentation |
Design price in roubles per м2(of the designed area) |
Minimum design price in roubles, |
| 1 |
General explanatory note |
21,6 – 36,6 |
15 000 |
| 2 |
General layout design and transport |
* |
30 000 |
| 3 |
Land improvement design |
* |
30 000 |
| 4 |
Process solutions design |
72 – 150 |
60 000 |
| 5 |
Architectural concepts design |
234 – 384 |
60 000 |
| 6 |
Architectural and construction concepts design |
234 – 384 |
60 000 |
| 7 |
Technical inspection design of the building constructions’ conditions of the existing construction (by reconstruction work) |
22,8 – 57 |
30 000 |
| 8 |
Design of reinforcement of existing bearing constructions |
150 – 228 |
60 000 |
| 9 |
Design of work organization on demolition and dismantling of major construction objects |
75 – 150 |
60 000 |
| 10 |
Building sides design |
147 – 210 |
30 000 |
| 11 |
Construction organization design |
* |
72 000 |
| 12 |
Traffic organization design for the construction period |
* |
48 000 |
| 13 |
Environmental protection design |
* |
72 000 |
| 14 |
Design of civil defense measures, measures on prevention of emergency situations |
* |
72 000 |
| Internal Engineering Networks |
| 15 |
Ventilation and conditioning design |
33 – 66 |
15 000 |
| 16 |
Smoke removal and space air overpressure design |
8,4 – 13,8 |
9 000 |
| 17 |
Power supply and illumination design |
28,8 – 48,6 |
15 000 |
| 18 |
Heating design |
31,8 – 52,8 |
15 000 |
| 19 |
Water supply and drain system design |
21,6 – 36,6 |
15 000 |
| 20 |
Engineering Technological Enterprise design |
22,8 – 57 |
150 000 |
| 21 |
Fire prevention measures design |
9 – 21 |
12 000 |
| 22 |
Sprinkling ,dry chemical and gas fire fighting design |
25,8 – 43,2 |
15 000 |
| 23 |
Automatic fire alarm, fire announcing and evacuation management design |
15 – 24,6 |
12 000 |
| 24 |
Intruder alarm design |
15 – 24,6 |
12 000 |
| 25 |
Fire fighting sprinkling system design |
25,8 – 43,2 |
15 000 |
| 26 |
Gas supply design |
28,8 – 48,6 |
15 000 |
| 27 |
Video control system design |
8,4 – 13,8 |
12 000 |
| 28 |
Control and access management design |
8,4 – 13,8 |
12 000 |
| 29 |
Installation of a public-address system and telephone services design |
15 – 24 |
15 000 |
| 30 |
“Clever house” design |
* |
90 000 |
| 31 |
Design of automatization and dispatching control of engineering systems |
* |
30 000 |
| On-Site Utilities |
| 32 |
Heat supply system design |
* |
* |
| 33 |
Water supply system design |
* |
* |
| 34 |
Drain system design |
* |
* |
| 35 |
Mains supply system design |
* |
* |
| 36 |
Gas supply system design |
* |
* |
| 37 |
Telephone service system design |
* |
* |
| Out-of-Site Utilities |
| 38 |
Heat supply system design |
* |
* |
| 39 |
Water supply system design |
* |
* |
| 40 |
Drain system design |
* |
* |
| 41 |
Mains supply system design |
* |
* |
| 42 |
Gas supply system design |
* |
* |
| 43 |
Telephone service system design |
* |
* |