| Ser. No |
Name |
Unit measure |
Price, roubles |
| Land works |
| 1 |
Laying out; , designing, survey operations |
m2 |
from 50 |
| 2 |
Earthwork by hand |
m3 |
from 1160 |
| 3 |
Vegetable soil chop-in 300 mm deep by hand |
m2 |
from 294 |
| 4 |
Backfill |
m3 |
from 870 |
| 5 |
Sand filling (ballast 10-15см) |
m2 |
from 232 |
| 6 |
Earth handling not more than 30m |
m3 |
from 725 |
| 7 |
Bottom stripping of trench walls and borrow pits by hand |
m2 |
from 348 |
| 8 |
Arrangements ofsand base and ballasts by hand |
m3 |
from 232 |
| 9 |
Preparatory screed coat |
m2 |
from 290 |
| 10 |
Roll waterproof finish (one layer) |
m2 |
from 290 |
| 11 |
Protective screed coat |
м2 |
from 580 |
| 12 |
Reinforcement of pit walls and trenches with boards, side form arrangement by infilling |
m2 |
from 232 |
| Foundation |
| 1 |
Bed preparation of concrete 70mm thick |
m2 |
from 364 |
| 2 |
Arrangement of small monolithic reinforced-concrete platforms on ground coat of prepared concrete with hand feed viscous armature |
m2 |
from 520 |
| 3 |
Construction of small monolithic concrete foundation cross and mat foundation with pouring and viscous armature, assembly and disassembly of timbering of boards and prepared concrete by hand |
m3 |
from 3770 |
| 4 |
Construction of strip foundation and basement walls out of concrete blocks with mixing of mortar |
m3 |
от 1160 |
| 5 |
Concreting of aliquant places with mixing of mortar, assembly and disassembly of timbering |
m3 |
от 3480 |
| 6 |
Construction ofpiled foundation to 300mm with installation of pipes out of asbestos-cement , lashing and building-up of cage, preparation and casing |
rm |
from 2760 |
| 7 |
Arrangement of small reinforced-concrete constructions with mixing of mortar |
m3 |
from 4870 |
| 8 |
Reinforced brickwork of base out of solid brickи for plasterwork with mixing of mortar |
m3 |
from 2900 |
| 9 |
Ground work walls cleaning from the rest ofground coat with water washing |
m2 |
from 203 |
| 10 |
Ground work cleaning wit brushes with open joint rubbing with matrix for dampproofing |
m2 |
from 348 |
| 11 |
Surface vertical waterproofer of ground work withbitum with mixture heating |
m2 |
from 217 |
| 12 |
Vertical waterproofer of ground work of two layers ofasbestos felt |
m2 |
from 580 |
| 13 |
Vertical waterproofer,1 layer |
m2 |
from 435 |
| 14 |
Horizontal waterproofer , 1 layer |
m2 |
from 290 |
| 15 |
Installation of prepared stairs |
pcs. |
from 435 |
| 16 |
Pool deck concreting 300mm thick with reinforced installation and form removal and reception of prepared concrete |
m3 |
from 7250 |
| 17 |
Production and installation of trays for concrete reception |
rm |
from 435 |
| 18 |
Continuous footing production (in the ground with timbering showing about 0.5m above land surface, re-enforcement, concreting) |
m3 |
from 2900 |
| 19 |
Continuous footing production (with timbering production for all height of ground work, re -enforcement, concreting) |
m3 |
from 3770 |
| 20 |
Rounded timbering production |
m2 |
from 435 |
| 21 |
Filling of interblock spaces with concrete |
m3 |
from 2320 |
| 22 |
Block assembling using machinery |
m3 |
from 1160 |
| 23 |
Rounded timbering production |
m2 |
from 435 |
| Flooring |
| 1 |
Lift slab assembling (less regard to equipment) |
pcs. |
from 1740 |
| 2 |
Arrangement of monolithic sections (timbering, re -enforcement, concreting) |
m2 |
from 1950 |
| 3 |
Filling slab-to-slab open joints with matrix |
rm |
from 232 |
| 4 |
Construction of monolithic reinforced-concrete covering ( timbering, re -enforcement, concreting )with the increase of number of storeys К =1.2 is used |
m2 |
from 3480 |
| 5 |
Wooden flooring construction (beam ) |
m2 |
from 348 |
| 6 |
Flooring board covering |
m2 |
from 392 |
| 7 |
Ceiling grating construction |
m2 |
from 348 |
| 8 |
Covering of ceiling with lining (open) |
m2 |
from 435 |
| 9 |
Covering of ceiling with lining (hidden) |
m2 |
from 348 |
| Walls
|
| 1 |
Demolition of brickwalls |
m3 |
from 2520 |
| 2 |
Demolition of brickwalls 0 .5 brick |
m2 |
from 324 |
| 3 |
Demolition of brickwalls 1 brick |
m2 |
from 702 |
| 4 |
Demolition of brickwalls 1 .5 brick |
m2 |
from 1134 |
| 5 |
Demolition of brickwalls 2 bricks |
m2 |
from 1512 |
| 6 |
Foam concrete block walling |
m3 |
from 2320 |
| 7 |
Face brick walling |
m2 |
from 1116 - 1450 |
| 8 |
Outer walling of bricks (0.5m thick) |
m3 |
from 2268 |
| 9 |
Inner partitions brick walling (1/2) |
m2 |
from 493 |
| 10 |
Window and door lintel assembling |
шт. |
from 375 |
| 11 |
Air chutes construction in brick walling |
rm |
from 725 |
| 12 |
Air chutes construction of pipes out of asbestos-cement |
rm |
from 522 |
| 13 |
Chimney and air chutes walling (one chute 250х250 profile) |
rm |
from 1570 |
| 14 |
Chimney and air chutes walling (added on every next chute) |
rm |
from 780 |
| 15 |
Walling of brick pillars |
rm |
from 1500 |
| 16 |
Winterization of walls |
m2 |
from 232 |
| 17 |
Stone furniture of walls |
m2 |
from 936 |
| 18 |
Turning of angles |
rm |
from 580 |
| 19 |
Beam walling |
m2 |
from 1168 |
| 20 |
Wooden grating production for walls |
m2 |
from 392 |
| 21 |
Stretching-over of grating with film |
m2 |
from 58 |
| 22 |
Inter-wall space filling with thermal insulation |
m2 |
from 232 |
| 23 |
Wall cladding with lining |
m2 |
from 624 |
| 24 |
Grating setting for siding |
m2 |
from 348 |
| 25 |
Wall siding |
m2 |
from 522 |
| Stairs |
| 1 |
Construction and assembling ofstair flights ( timbering, re -enforcement, concreting ): |
|
|
|
| pace |
m2 |
from 4350 |
| |
step |
pcs. |
from 2900 |
| |
Turning step |
pcs. |
from 4350 |
| 2 |
Wooden stairs construction : |
|
|
| |
pace |
m2 |
from 1856 |
| |
Direct step |
pcs. |
from 1305 |
| |
Turning step |
pcs. |
from 2175 |
| |
Installation of railings with balusters |
pcs. |
from 2320 |
| 3 |
Step facing 1m wide: |
|
|
| |
With tile |
pcs. |
from 870 |
|
| With stone |
pcs. |
from 957 |
|
| With wood (block parquet ) |
pcs. |
from 1595 |
| Roof |
| 1 |
Roof construction and assembling (simple) |
m2 |
from 754 |
| 2 |
Timbered roof assembling |
m2 |
from 290 |
| 3 |
Grating installation |
m2 |
from 174 |
| 4 |
Roof reinforcement |
m2 |
from 232 |
| 5 |
Covering with roofing material: |
|
|
| |
Euro-asbestos sheeting |
m2 |
from 174 |
| |
metal tile |
m2 |
from 290 |
| |
Soft roof |
m2 |
from 435 |
| |
tile |
m2 |
from 580 |
| 6 |
Making of ventilation openings |
pcs. |
from 725 |
| 7 |
Dormer window installation |
pcs. |
from 2900 |
| 8 |
Antiicing system assembling |
m2 |
from 870 |
| 9 |
Wind lath boarding – direct |
rm |
from 174 |
| 10 |
Wind lath boarding – slanting |
rm |
from 348 |
| 11 |
Ceiling boarding with siding (to 80 cm) |
rm |
from 580 |
| 12 |
Assembling of horizontaldrain sewage system |
rm |
from 348 |
| 13 |
Assembling of verticaldrain sewage system |
rm |
from 290 |
| 14 |
Covering of drips, fireproof walls, barrier walls |
rm |
from 435 |
| Front elevation |
| 1 |
Wood assembling |
m2 |
from 145 |
| 2 |
Tall wood dismantling |
m2 |
from 73 |
| 3 |
Face overcoating |
m2 |
from 580 |
| 4 |
Overcoating of direct rustication grooves |
rm |
from 232 |
| 5 |
Overcoating of rounded rustication grooves |
rm |
from 348 |
| 6 |
Overcoating of angles |
rm |
from 174 |
| 7 |
Overcoating of slopes |
rm |
from 580 |
| 8 |
Rustication groove production out of foam-plexus (rounded) |
rm |
from 290 |
| 9 |
Rustication groove production out of foam-plexus ( rounded) |
rm |
from 348 |
| 10 |
Face coloring with decoration plaster |
m2 |
from 348 |
| 11 |
Rustication groove coloring |
rm |
from 232 |
| 12 |
Coloring of slopes |
rm |
from 203 |
| 13 |
Rustication groove production on the sole plate |
rm |
from 435 |
| 14 |
Rustication groove overcoating with tiles |
rm |
from 580 |
| 15 |
Installation of drips |
rm |
from 290 |
| 16 |
Wall plank installation |
rm |
from 232 |
| 17 |
Production and installation of ornamental wooden beam constructions with semi-antique polishing and varnishing |
m |
from 580 |
| Landscape works |
| 1 |
Cable routing in a pipe under ground |
rm |
from 203 |
| 2 |
Foundation concreting for lamps |
шт. |
from 580 |
| 3 |
Drain arrangement around the building ( 2m deep) |
rm |
from 2592 |
| 4 |
Pipe lay for water supply and drain system |
rm |
from 348 |
| 5 |
Well construction |
ring |
from 2200 |
| 6 |
Laying of paving slab (digging crush-rock pad, laying) |
m2 |
from 754 |
| 7 |
Curb stone installation –direct |
rm |
from 348 |
| 8 |
Curb stone installation –rounded |
rm |
from 435 |
| 9 |
Drain construction along the blind area out of prepared elements |
rm |
from 348 |
| 10 |
Land digging with litter and weed removal (1 time) |
rm |
from 362 |
| 11 |
Lawn construction (crush-rock pad of fertile layer, beating, grass planting) |
m2 |
from 232 |
| 12 |
Arrangement of lamps on the lawn |
pcs. |
from 783 |
| 13 |
Stone laying on the revetment wall |
m2 |
from 754 |
| 14 |
Construction of storm drainage (without land work) |
rm |
from 290 |
| 15 |
Installation of catch-water |
pcs. |
from 1450 |