Certified according to the international quality standards GOST R ISO 9001-2008  
RuEn
Main   »   English version   »   Price-list   »   Construction Work

Construction Work

Ser. No Name Unit measure Price, roubles
Land works
1 Laying out; , designing, survey operations m2 from 50
2 Earthwork by hand m3 from 1160
3 Vegetable soil chop-in 300 mm deep by hand m2 from 294
4 Backfill m3 from 870
5 Sand filling (ballast 10-15см) m2 from 232
6 Earth handling not more than 30m m3 from 725
7 Bottom stripping of trench walls and borrow pits by hand m2 from 348
8 Arrangements ofsand base and ballasts by hand m3 from 232
9 Preparatory screed coat m2 from 290
10 Roll waterproof finish  (one layer) m2 from 290
11 Protective screed coat м2 from 580
12 Reinforcement of pit walls and trenches with boards, side form arrangement by  infilling m2 from 232
Foundation
1 Bed preparation of concrete 70mm thick m2 from 364
2 Arrangement of small monolithic reinforced-concrete platforms on ground coat of prepared concrete with hand feed viscous armature m2 from 520
3 Construction of small monolithic concrete foundation cross  and mat foundation with pouring and viscous armature, assembly and disassembly of timbering of boards and prepared concrete by hand m3 from 3770
4 Construction of strip foundation and basement walls out of concrete blocks with mixing of mortar m3 от 1160
5 Concreting of aliquant places  with mixing of mortar, assembly and disassembly of timbering m3 от 3480
6 Construction ofpiled foundation  to 300mm with installation of pipes out of asbestos-cement , lashing and building-up of cage, preparation and casing rm from 2760
7 Arrangement of small reinforced-concrete constructions with mixing of mortar m3 from 4870
8 Reinforced brickwork of base out of solid brickи for plasterwork with mixing of mortar m3 from 2900
9 Ground work walls cleaning from the rest ofground coat with water washing m2 from 203
10 Ground work cleaning wit brushes  with open joint rubbing with matrix for dampproofing  m2 from 348
11 Surface vertical waterproofer  of ground work withbitum with mixture heating m2 from 217
12 Vertical waterproofer of ground work of two layers ofasbestos felt  m2 from 580
13 Vertical waterproofer,1 layer m2 from 435
14 Horizontal waterproofer , 1 layer m2 from 290
15 Installation of prepared stairs pcs. from 435
16 Pool deck concreting  300mm thick with reinforced installation and form removal and reception of prepared concrete m3 from 7250
17 Production and installation of trays for concrete reception rm from 435
18 Continuous footing production (in the ground with timbering showing about 0.5m above land surface, re-enforcement, concreting) m3 from 2900
19 Continuous footing production (with timbering production for all height of ground work, re -enforcement, concreting) m3 from 3770
20 Rounded timbering production m2 from 435
21 Filling of interblock spaces with concrete m3 from 2320
22 Block assembling using machinery m3 from 1160
23 Rounded timbering production m2 from 435
Flooring
1 Lift slab assembling (less regard to equipment) pcs. from 1740
2 Arrangement of monolithic sections (timbering, re -enforcement, concreting) m2 from 1950
3 Filling slab-to-slab open joints with matrix rm from 232
4 Construction of monolithic            reinforced-concrete  covering ( timbering, re -enforcement, concreting )with the increase of number of storeys  К =1.2 is used m2 from 3480
5 Wooden flooring construction (beam ) m2 from 348
6 Flooring board covering m2 from 392
7 Ceiling grating construction m2 from 348
8 Covering of ceiling with lining (open) m2 from 435
9 Covering of ceiling with lining (hidden) m2 from 348
Walls
1 Demolition of brickwalls m3 from 2520
2 Demolition of brickwalls 0 .5 brick m2 from 324
3 Demolition of brickwalls 1 brick m2 from 702
4 Demolition of brickwalls 1 .5 brick m2 from 1134
5 Demolition of brickwalls 2 bricks m2 from 1512
6 Foam concrete block walling m3 from 2320
7 Face brick walling m2 from 1116 - 1450
8 Outer walling of bricks (0.5m thick) m3 from 2268
9 Inner partitions brick walling (1/2) m2 from 493
10 Window and door lintel assembling шт. from 375
11 Air chutes construction in brick walling rm from 725
12 Air chutes construction of pipes out of asbestos-cement  rm from 522
13 Chimney and air chutes walling (one chute 250х250 profile) rm from 1570
14 Chimney and air chutes walling (added on every next chute) rm from 780
15 Walling of brick pillars rm from 1500
16 Winterization of walls m2 from 232
17 Stone furniture of walls m2 from 936
18 Turning of angles rm from 580
19 Beam walling m2 from 1168
20 Wooden grating production for walls m2 from 392
21 Stretching-over of grating with film m2 from 58
22 Inter-wall space filling with thermal insulation m2 from 232
23 Wall cladding with lining m2 from 624
24 Grating setting for siding m2 from 348
25 Wall siding m2 from 522
Stairs
1 Construction and assembling ofstair flights ( timbering, re -enforcement, concreting ):    
  pace m2 from 4350
  step pcs. from 2900
  Turning step pcs. from 4350
2 Wooden stairs construction :    
  pace m2 from 1856
  Direct step pcs. from 1305
  Turning step pcs. from 2175
  Installation of railings with balusters pcs. from 2320
3 Step facing 1m wide:    
  With tile pcs. from 870
  With stone pcs. from 957
  With wood (block parquet ) pcs. from 1595
Roof
1 Roof construction and assembling (simple) m2 from 754
2 Timbered roof assembling m2 from 290
3 Grating installation m2 from 174
4 Roof reinforcement m2 from 232
5 Covering with roofing material:    
  Euro-asbestos sheeting m2 from 174
   metal tile m2 from 290
  Soft roof m2 from 435
   tile m2 from 580
6 Making of ventilation openings pcs. from 725
7 Dormer window installation pcs. from 2900
8 Antiicing system assembling m2 from 870
9 Wind lath boarding – direct rm from 174
10 Wind lath boarding – slanting rm from 348
11 Ceiling boarding with siding (to 80 cm) rm from 580
12 Assembling of horizontaldrain sewage system rm from 348
13 Assembling of verticaldrain sewage system rm from 290
14 Covering of drips, fireproof walls, barrier walls rm from 435
Front elevation
1 Wood assembling m2 from 145
2 Tall wood dismantling  m2 from 73
3 Face overcoating m2 from 580
4 Overcoating of direct rustication grooves rm from 232
5 Overcoating of rounded rustication grooves rm from 348
6 Overcoating of angles rm from 174
7 Overcoating of slopes rm from 580
8 Rustication groove production out of foam-plexus (rounded) rm from 290
9 Rustication groove production out of foam-plexus ( rounded) rm from 348
10 Face  coloring with decoration plaster m2 from 348
11 Rustication groove coloring rm from 232
12 Coloring of slopes rm from 203
13 Rustication groove production on the         sole plate rm from 435
14 Rustication groove overcoating with tiles rm  from 580
15 Installation of drips rm from 290
16 Wall plank installation rm from 232
17 Production and installation of  ornamental wooden beam constructions with semi-antique polishing and varnishing m from 580
Landscape works
1 Cable routing in a pipe under ground rm from 203
2 Foundation concreting for lamps шт. from 580
3 Drain arrangement around the building    ( 2m deep) rm from 2592
4 Pipe lay  for water supply and drain system rm from 348
5 Well construction ring from 2200
6 Laying of paving slab (digging      crush-rock pad, laying) m2 from 754
7 Curb stone installation –direct rm from 348
8 Curb stone installation –rounded rm from 435
9 Drain construction along the blind area out of prepared elements rm from 348
10 Land digging with litter and weed removal  (1 time) rm from 362
11 Lawn construction (crush-rock pad of  fertile layer, beating, grass planting) m2 from 232
12 Arrangement of lamps on the lawn pcs. from 783
13 Stone laying on the revetment wall m2 from 754
14 Construction of storm drainage (without land work) rm from 290
15 Installation of catch-water pcs. from 1450
2008 © RosArkhitektor Ltd. - architectural planning of buildings, cottages
Moscow, 4-Magistralnaya Street 5, building 2, telephone number: (495)991-87-09
rosarchitektor@mail.ru, rosarch@yandex.ru, info@rosarch.ru